Energy

turbinas-fundaciones-cimentacion-inundabilidad-fotovoltaica-solar-hidroelectrica-subestaciones

The timely consideration of environmental, geological, and hydrological factors in energy projects allows for the optimization of their location and the sustainable use of natural resources.

In addition to the dams of hydroelectric power plants, which have their own chapter (see "Some Special Works"), we have worked on methodologies to optimize the location of small hydroelectric power plants, in different stages of their design, and in evaluating existing power plants for capacity expansion or extending their lifespan. We have also conducted flood studies for substations and provided foundation and geotechnical designs for solar and wind projects and transmission lines.

Project

Guajira 1 Wind Farm (ISAGEN). It has 10 turbines of 2 MW each (20 MW), equivalent to the consumption of 33,000 households. We participated in the geological and geotechnical characterization, seismic hazard evaluation, foundation design of the turbines, and design and recommendations for service roads.

OUR CLIENTS