In addition to sanitary landfills, which have their own chapter (see "Some Special Works"), we have experience in designing sewage systems for wastewater and conducting studies on effluent discharges.
Project
Gramalote. This project involved the design of approximately 20 km of public utility networks for water supply and sewage for the new urban center of the municipality of Gramalote, at a detailed level or Phase III for construction. The project included the design of 5,600 m of water supply network, the design of 5,800 m of residual sewer network, and the design of 8,080 m of stormwater sewer network.