Tunnels pose great geological uncertainties and challenges in their design, construction monitoring, and operation.
INTEINSA has experience in tunnel design for coverings, false tunnels, portal design, instrumentation, and pathology.
Projects

The AIA-Estyma Consortium hired us to design a 90m tunnel in an anthropic deposit to rehabilitate the covering of El Ahorcado creek in Medellin. The tunnel is in the form of an arch and has a height of 5.3m (2.15m circular section) and a width of 4.3m.

The Adaptation Fund commissioned us for Phase III design of the stabilization of 21 critical sites along the Dabeiba - Santa Fe de Antioquia corridor, which includes three false tunnels.